This thumbnail page was generated by the evaluation version of ThumbsPlus
this is the 3rd level (under the caddie and 2 trays)
100_1158.JPG
380.13 Kb
piece of honeylocust ready for the bandsaw
100_1157.JPG
361.36 Kb
top was completed first, everything was fitted from there
100_1160.JPG
451.34 Kb
glue up of the sides
100_1234.JPG
687.96 Kb
mosaic before holly was glued to sides
100_1215.JPG
405.60 Kb
completed tile, ready for resaw
100_1208.JPG
570.88 Kb
3rd level dividers/skeleton
100_1207.JPG
644.34 Kb
box side with sliding dovetail ready
100_1204.JPG
451.60 Kb
front (top, drawer, arch) ready for glue up
100_1203.JPG
576.90 Kb
100_1200.JPG
602.41 Kb
lock mortised
100_1197.JPG
438.81 Kb
close up of post with dovetail ways
100_1191.JPG
484.18 Kb
hinge mortised with razor blades
100_1240.JPG
357.46 Kb
100_1379.JPG
531.81 Kb
100_1377.JPG
589.22 Kb
100_1328.JPG
666.74 Kb
100_1398.JPG
512.76 Kb
100_1410.JPG
810.29 Kb
There are many more photos, and I documented each step if you are interested in the complete instructions
|
|||||